免费看人妻换人妻互换A片爽_亚洲中文字幕Av_亚洲国产第一页_日韩精品影院在线链接_国产蜜桃一区二区精品_久久久久久久精品免费_国产在线观看无码免费视频 _无码人妻精品一区二_成人亚洲AV无码专区一区丁香

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator installation precautions

皮囊式蓄能器2.jpg

 

The accumulator should be installed at a convenient location for inspection and maintenance. When used to absorb shock and pulsation, the accumulator should be close to the vibration source, and should be installed in the place where the impact is easy. The installation position should be away from the heat source to prevent the system pressure from rising due to the thermal expansion of the gas.


The accumulator must be securely fastened but not allowed to be welded to the main unit and should be securely supported on the bracket or on the wall. When the diameter ratio is too large, hoop reinforcement should also be provided.


In principle, the capsule accumulator should be installed vertically downwards. When tilting or horizontally mounted, the bladder is in contact with the shell by buoyancy, which hinders normal telescopic operation, accelerates the damage of the bladder, and reduces the risk of accumulator function. . Therefore, the method of tilting or horizontal mounting is generally not used. There are no special installation requirements for diaphragm accumulators, and the oil ports can be installed vertically, tilted or horizontally downwards.


A check valve should be installed between the pump and the accumulator to prevent the oil in the accumulator from flowing back into the pump and returning to the tank when the pump stops working, causing an accident.


元朗区| 山西省| 敖汉旗| 岱山县| 长乐市| 乌兰县| 广汉市| 阿拉善盟| 勐海县| 潞城市| 鄄城县| 桑日县| 长海县| 石城县| 惠州市| 苍梧县| 绵竹市| 资源县| 南丰县| 苏尼特右旗| 锦屏县| 荆门市| 高唐县| 牡丹江市| 灌云县| 顺义区| 达孜县| 余干县| 姜堰市| 台北市| 漯河市| 塔河县| 永兴县| 手机| 台前县| 保亭| 明光市| 北碚区| 温宿县| 卢龙县| 乌兰察布市|