免费看人妻换人妻互换A片爽_亚洲中文字幕Av_亚洲国产第一页_日韩精品影院在线链接_国产蜜桃一区二区精品_久久久久久久精品免费_国产在线观看无码免费视频 _无码人妻精品一区二_成人亚洲AV无码专区一区丁香

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標(biāo)題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.


米易县| 敦化市| 元谋县| 吉林省| 益阳市| 尚义县| 济南市| 宣汉县| 芮城县| 沭阳县| 桦甸市| 巴林右旗| 吉安县| 陆河县| 上蔡县| 定安县| 郧西县| 临清市| 泰宁县| 邢台县| 太和县| 颍上县| 科技| 大方县| 寻乌县| 游戏| 堆龙德庆县| 广昌县| 拉萨市| 怀来县| 磐安县| 襄樊市| 镇远县| 台中县| 东丰县| 南川市| 平原县| 靖西县| 鄯善县| 克山县| 大悟县|